Keeping Nature Connected – EIA For Integrate Green Infrastructure Planning
Exercise 3 – Measures
Propose a motorway route, starting from point A to point B, keeping into consideration the obstacles found on the river valley as well as the known movement patterns of large mammals through the valley. Identify where structures (tunnels, bridges, viaducts, embankments, cuttings, etc.) should be placed on the proposed route.