EIA Training Package

Keeping Nature Connected – EIA For Integrate Green Infrastructure Planning

Exercise 3 – Measures

Propose a motorway route, starting from point A to point B, keeping into consideration the obstacles found on the river valley as well as the known movement patterns of large mammals through the valley. Identify where structures (tunnels, bridges, viaducts, embankments, cuttings, etc.) should be placed on the proposed route.

Download the sheet for exercise 3

Back to the table of contents